Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards.
If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form.
Last Revised: Oct 2026
Division 00 - Procurement and Contracting Requirements
| Section # | Title | Last Revised |
|---|---|---|
| 00 21 13 | Instructions to Bidders | Nov 2013 |
| 00 22 13 | Supplementary Instructions to Bidders | Jun 2014 |
| 00 73 19 | Health and Safety Requirements | Jun 2014 |
Division 01 - General Requirements
| Section # | Title | Last Revised |
|---|---|---|
| 01 00 00 | General Requirements | Jun 2014 |
| 01 10 00 | Summary | Jun 2014 |
| 01 11 13 | Work Covered by Contract Documents | Jun 2014 |
| 01 14 16 | Coordination with Occupants | Jun 2014 |
| 01 23 00 | Alternates | Jun 2014 |
| 01 32 13 | Scheduling of Work | Jun 2014 |
| 01 33 00 | Submittal Procedures | Jun 2014 |
| 01 45 29 | Testing Laboratory Services | Jun 2014 |
| 01 50 00 | Tree Protection Zone | Mar 2018 |
| 01 51 13 | Temporary Electricity | Jun 2014 |
| 01 51 23 | Temporary Heating, Cooling, and Ventilating | Nov 2013 |
| 01 51 33 | Temporary Telecommunications | Jun 2014 |
| 01 51 36 | Temporary Water | Nov 2013 |
| 01 52 13 | Field Offices and Sheds | Nov 2013 |
| 01 52 19 | Sanitary Facilities | Jun 2014 |
| 01 66 00 | Product Storage and Handling Requirements | Nov 2013 |
| 01 74 00 | Cleaning and Waste Management | Feb 2017 |
| 01 74 19 | Construction Waste Management and Disposal | Mar 2018 |
| 01 74 23 | Final Cleaning | June 2019 |
| 01 77 00 | Closeout Procedures | Nov 2013 |
| 01 78 00 | Closeout Submittals | Jun 2014 |
| 01 78 23.16 | Maintenance Data | Nov 2013 |
| 01 78 23.19 | Preventative Maintenance Instructions | Nov 2013 |
| 01 78 33 | Bonds | Nov 2013 |
| 01 78 36 | Warranties | Nov 2013 |
| 01 78 39 | Project Record Documents | Jun 2014 |
| 01 79 00 | Demonstration and Training | May 2018 |
| Appendices | ||
| A015110 | Temporary Services | |
| A015120 | Tree Protection Zone | |
| A015210 | Construction Sites |
Division 02 - Existing Conditions
| Section # | Title | Last Revised |
|---|---|---|
| 02 82 00 | Asbestos Remediation | Jun 2014 |
| 02 83 00 | Lead Remediation | Feb 2014 |
| Appendices | ||
| A020010 | Duke Landscape |
Division 03 - Concrete
| Section # | Title | Last Revised |
|---|---|---|
| 03 00 00 | Concrete | Nov 2013 |
| 03 05 00 | Common Work Results for Concrete | Nov 2013 |
| 03 40 00 | Precast Concrete | Nov 2013 |
Division 04 - Masonry
| Section # | Title | Last Revised |
|---|---|---|
| 04 01 20.52 | Unit Masonry Cleaning | Jun 2014 |
| 04 01 20.91 | Unit Masonry Restoration | Nov 2013 |
| 04 01 40.52 | Stone Cleaning | Jun 2014 |
| 04 01 40.91 | Stone Restoration | Nov 2013 |
| 04 20 00 | Unit Masonry | Nov 2013 |
| 04 21 13 | Duke Brick | Jun 2014 |
| 04 40 00 | Duke Stone Assemblies | Jun 2014 |
| Appendices | ||
| A042010 | Duke Brick | |
| A044010 | Duke Stone | |
| A044090 | Stone Rest |
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
| Section # | Title | Last Revised |
|---|---|---|
| 06 00 00 | Woods, Plastics, and Composites | Nov 2013 |
| 06 10 00 | Rough Carpentry | Nov 2013 |
| 06 20 00 | Finish Carpentry | Jun 2014 |
Division 07 - Thermal and Moisture Protection
| Section # | Title | Last Revised |
|---|---|---|
| 07 00 00 | Thermal and Moisture Protection | Nov 2013 |
| 07 13 00 | Sheet Waterproofing | Jun 2014 |
| 07 19 00 | Water Repellants | Nov 2013 |
| 07 21 00 | Thermal Insulation | Nov 2013 |
| 07 26 00 | Vapor Retarders | Nov 2013 |
| 07 30 00 | Steep Slope Roofing | Nov 2013 |
| 07 40 00 | Roofing | Jun 2014 |
| 07 41 63 | Fabricated Roof Panel Assemblies | Nov 2013 |
| 07 60 00 | Flashing and Sheet Metal | Nov 2013 |
| 07 70 00 | Roof and Wall Specialties and Accessories | Nov 2013 |
| 07 80 00 | Fire and Smoke Protection | Nov 2013 |
| 07 90 00 | Joint Protection | Jun 2014 |
| Appendices | ||
| A074090 | Roofing |
Division 08 - Openings
| Section # | Title | Last Revised |
|---|---|---|
| 08 00 00 | Openings | Jun 2014 |
| 08 01 80 | Maintenance of Glazing (Leaded Glass Window Restoration) | Nov 2013 |
| 08 11 00 | Metal Doors and Frames | Jun 2014 |
| 08 14 00 | Wood Doors | Nov 2013 |
| 08 51 13 | Aluminum Windows | Nov 2013 |
| 08 70 00 | Hardware | Nov 2013 |
| 08 71 00 | Door Hardware | Jun 2014 |
| 08 90 00 | Louvers and Vents | Jun 2014 |
Division 09 - reserved
Division 10 - Specialties
| Section # | Title | Last Revised |
|---|---|---|
| 10 00 00 | Specialties | Mar 2018 |
| 10 11 00 | Visual Display Surfaces | June 2014 |
| 10 14 00 | Signage | June 2014 |
| 10 21 13.19 | Plastic Toilet Compartments | Nov 2013 |
| 10 28 13.13 | Commercial Toilet Accessories | Mar 2018 |
| 10 44 13 | Fire Extinguisher Cabinets | June 2014 |
| 10 44 16 | Fire Extinguishers | June 2014 |
| 10 51 13 | Metal Lockers | June 2014 |
| Appendices | ||
| A101420 | Signage | |
| A102813 | Bath Accessories | Nov 2025 |
| A105613 | Metal Shelving |
Division 11 - Equipment
| Section # | Title | Last Revised |
|---|---|---|
| 11 00 00 | Equipment | Jun 2014 |
| 11 12 00 | Parking Control Equipment | Nov 2013 |
| 11 13 00 | Loading Dock Equipment | Nov 2013 |
| 11 21 23 | Vending Equipment | Nov 2013 |
| 11 30 00 | Residential Equipment | Nov 2013 |
| 11 40 00 | Foodservice Equipment | Nov 2013 |
| 11 52 00 | Audio-Visual Equipment | Nov 2013 |
| 11 53 00 | Laboratory Equipment | Jun 2014 |
| 11 82 13 | Solid Waste Bins | Feb 2017 |
| 11 82 26 | Waste Compactor and Destructors | Feb 2017 |
| Appendices | ||
| A111310 | Equipment items | |
| A118213 | Solid Waste Bins | |
| A118223 | Recycling Equipment | |
| A118226 | Waste Compactor and Destructors |
Division 12 - reserved
Division 13 - Special Construction
| Section # | Title | Last Revised |
|---|---|---|
| 13 00 00 | Special Construction | Nov 2013 |
| 13 34 00 | Fabricated Engineered Structures | Nov 2013 |
Division 14 - Conveying Equipment
| Section # | Title | Last Revised |
|---|---|---|
| 14 01 00 | Guarantees, Service & Manuals | Jun 2014 |
| 14 20 00 | Elevators | Jun 2014 |
| 14 24 00 | Hydraulic Elevators | Nov 2013 |
| 14 42 16 | Vertical Wheelchair Lifts | Jun 2014 |
Division 15 - reserved
Division 16 - reserved
Division 17 - reserved
Division 18 - reserved
Division 19 - reserved
Division 20 - reserved
Division 21 - Fire Suppression
| Section # | Title | Last Revised |
|---|---|---|
| 21 05 19 | Meter and Gauges for Fire-Suppression Systems | Jun 2014 |
| 21 13 13 | Wet-Pipe Sprinkler Systems | Jun 2014 |
Division 22 - Plumbing
| Section # | Title | Last Revised |
|---|---|---|
| 22 05 00 | Common Work Results for Plumbing | Mar 2018 |
| 22 05 09 | Meters and Gauges for Plumbing | Jan 2019 |
| 22 05 23 | Valves for Plumbing Piping | Oct 2026 |
| 22 07 00 | Insulation and Identification For Plumbing Piping and Equipment | Aug 2026 |
| 22 08 00 | Commissioning of Plumbing | Mar 2018 |
| 22 09 23 | Plumbing Systems Control Schematics | Aug 2026 |
| 22 09 23.13 | Water Utility Metering | Feb 2025 |
| 22 09 93 | Plumbing Systems Sequences of Operations | Aug 2026 |
| 22 10 10 | Plumbing Pumps | Aug 2026 |
| 22 11 18 | Plumbing Piping | Nov 2024 |
| 22 11 19 | Domestic Water Specialties | Mar 2018 |
| 22 30 00 | Domestic Hot Water Systems | Aug 2026 |
| 22 40 00 | Plumbing Fixtures | Mar 2018 |
| 22 60 00 | Gas and Vacuum Systems for Laboratory and Healthcare Facilities | Mar 2018 |
Division 23 - Heating, Ventilating, and Air-Conditioning (HVAC)
| Section # | Title | Last Revised |
|---|---|---|
| 23 00 00.01 | Load Calculations | Aug 2024 |
| 23 00 00.02 | Requirements for Drawings | Aug 2024 |
| 23 00 00.10 | Mechanical Equipment Room Design | Aug 2024 |
| 23 05 13 | Common Motor Requirements for HVAC Equipment | Nov 2024 |
| 23 05 23 | Valves for Mechanical Piping | Oct 2026 |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | Nov 2024 |
| 23 07 00 | Insulation and Identification For Mechanical Piping and Equipment | Aug 2026 |
| 23 08 00 | Commissioning of HVAC Systems | Mar 2018 |
| 23 09 13 | HVAC Instrumentation and Control | Sept 2026 |
| 23 09 23 | Sensors and Instruments | Feb 2025 |
| 23 09 23.10 | BACnet Control Systems and Integration | Sept 2026 |
| 23 09 23.11 | Pressure Independent Control Valves | Feb 2025 |
| 23 09 23.13 | Thermal Utility Metering | Mar 2026 |
| 23 09 93 | HVAC Sequences of Operations | Sept 2026 |
| 23 09 93.10 | HVAC Control Schematics | Sept 2026 |
| 23 21 13 | Building Mechanical Piping | Nov 2024 |
| 23 21 23 | Hydronic Pumps | April 2025 |
| 23 22 13 | Building Steam & Condensate Piping Systems | Feb 2025 |
| 23 25 00 | HVAC Water Treatment, Flushing and Cleaning | Nov 2024 |
| 23 31 00 | HVAC Ducts and Casings | April 2025 |
| 23 50 00 | Building Central Heating Equipment | Nov 2024 |
| 23 60 00 | Chilled Water and Heating Hot Water Systems | Jul 2026 |
| 23 70 00 | Central HVAC Equipment (Air Handling Units) | April 2025 |
| 23 82 19 | Fan Coil and Blower Coil Units | April 2025 |
| Appendices | ||
| N/A | Duke-Siemens | April 2025 |
Division 24 - reserved
Division 25 - reserved
Division 26 - Electrical
| Section # | Title | Last Revised |
|---|---|---|
| 26 05 19 | Building Wire and Cable | Mar 2018 |
| 26 05 26 | Grounding and Bonding for Electrical Systems | Mar 2018 |
| 26 05 33 | Raceway and Boxes for Electrical Systems | Mar 2018 |
| 26 05 53 | Identification | Jan 2019 |
| 26 05 76 | Arc-Flash Studies | May 2015 |
| 26 08 00 | Commissioning of Electrical Systems | Mar 2018 |
| 26 08 01 | Electrical Acceptance Testing | Jun 2014 |
| 26 20 00 | Low-Voltage Electrical Distribution | Mar 2018 |
| 26 24 00 | Switchboards and Panelboards | Jun 2014 |
| 26 24 16 | Panelboards | Oct 2014 |
| 26 27 26 | Wiring Devices | Jun 2014 |
| 26 56 00 | Area Site Lighting | Jan 2019 |
Division 27 - Communications
| Section # | Title | Last Revised |
|---|---|---|
| 27 00 00 | Communication Facilities Construction Design Standards | Jun 2014 |
| 27 52 25 | Assistive Listening Systems | Jun 2014 |
| Appendices | ||
| A270000 | Communications |
Division 28 - Electronic Safety and Security
| Section # | Title | Last Revised |
|---|---|---|
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | Jun 2014 |
| 28 31 00 | Fire Detection and Alarm | Jun 2014 |
| 28 31 46 | Smoke Detection Sensors | Jun 2014 |
Division 29 - reserved
Division 30 - reserved
Division 31 - Earthwork
| Section # | Title | Last Revised |
|---|---|---|
| 31 23 00 | Trenching Backfilling and Compaction of Utilities | May 2026 |
| 31 25 00 | Erosion and Sedimentation Controls | Nov 2018 |
Division 32 - Exterior Improvements
| Section # | Title | Last Revised |
|---|---|---|
| 32 01 90 | Operation and Maintenance of Planting | Jan 2019 |
| 32 01 90.13 | Fertilizing | Nov 2018 |
| 32 01 90.23 | Pruning | Nov 2018 |
| 32 01 90.26 | Watering | Nov 2018 |
| 32 80 00 | Irrigation | Aug 2017 |
| 32 91 13 | Soil Preparation | Feb 2016 |
| 32 91 13.26 | Mulch | Nov 2018 |
| 32 92 19 | Seeding | Jan 2019 |
| 32 92 23 | Sodding | Nov 2018 |
| 32 93 00 | Plants | Feb 2016 |
| 32 93 13 | Groundcovers | Nov 2018 |
| 32 93 43 | Trees | Mar 2018 |
| Appendices | ||
| A320010 | Boundary Fencing | |
| A329100 | Tree Planting Detail | |
| A015639 | Tree Protection Zone | |
| Tree Protection - Maintenance Road | ||
| Tree Protection - Boring Under Crown Dripline | ||
| Modified Existing Soil- Compacted Subsoil (Trenching) | ||
Division 33 - Utilities
| Section # | Title | Last Revised |
|---|---|---|
| 33 11 00 | Water Utility Distribution Piping | Mar 2018 |
| 33 30 00 | Sanitary Sewer | Mar 2018 |
| 33 40 00 | Storm Drainage | Mar 2018 |
| 33 61 00 | Chilled Water Distribution | Jul 2026 |
| 33 62 00 | Heating Hot Water Distribution | June 2026 |
| 33 63 00 | Underground Steam and Condensate System | Mar 2018 |
| 33 70 00 | 44kV Loop Easement Work Approval Process | Mar 2025 |
| Appendices | ||
| A336300 | Steam Energy Distribution |
Division 34 - Transportation
Division 35 - Waterway and Marine Construction
Division 36 - reserved
Division 37 - reserved
Division 38 - reserved
Division 39 - reserved
Division 40 - reserved
Division 41 - Material Processing and Handling Equipment
Division 42 - Process Heating, Cooling, and Drying Equipment
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment
Division 44 - Pollution Control Equipment
Division 45 - Industry-Specific Manufacturing Equipment
Division 46 - reserved
Division 47 - reserved
Division 48 - Electrical Power Generation
Division 49 - reserved
Division 50 - reserved
DRAFT Landscape and Irrigation
| Title |
|---|
| Planting Specifications |
| Planting Soil Specifications |
| Root Pruning Standard Operating Procedure |
| Tree Planting Executive Summary |
| Tree Protection Zones (TPZs) |
Additional Files - Supplemental Guidelines and Standards
| Title |
|---|
| Support Space - Planning Standards: |
| - Telecommunication Systems Guidelines |
| - Service Spaces |
| - Lactation Rooms |
| Sustainable Building Guidelines & Related Documents: |
| - Sustainable Building Guideline |
| - Sustainable Building Project Checklist |
| - Energy Modeling Information Form |
| Utility Marking Standards |
| Conceptual Design Goals |
| Section # | Title | Last Revised |
|---|---|---|
| 01 00 00 | General Requirements | Jun 2014 |
| 01 10 00 | Summary | Jun 2014 |
| 01 11 13 | Work Covered by Contract Documents | Jun 2014 |
| 01 14 16 | Coordination with Occupants | Jun 2014 |
| 01 23 00 | Alternates | Jun 2014 |
| 01 32 13 | Scheduling of Work | Jun 2014 |
| 01 33 00 | Submittal Procedures | Jun 2014 |
| 01 45 29 | Testing Laboratory Services | Jun 2014 |
| 01 50 00 | Tree Protection Zone | Mar 2018 |
| 01 51 13 | Temporary Electricity | Jun 2014 |
| 01 51 23 | Temporary Heating, Cooling, and Ventilating | Nov 2013 |
| 01 51 33 | Temporary Telecommunications | Jun 2014 |
| 01 51 36 | Temporary Water | Nov 2013 |
| 01 52 13 | Field Offices and Sheds | Nov 2013 |
| 01 52 19 | Sanitary Facilities | Jun 2014 |
| 01 66 00 | Product Storage and Handling Requirements | Nov 2013 |
| 01 74 00 | Cleaning and Waste Management | Feb 2017 |
| 01 74 19 | Construction Waste Management and Disposal | Mar 2018 |
| 01 74 23 | Final Cleaning | June 2019 |
| 01 77 00 | Closeout Procedures | Nov 2013 |
| 01 78 00 | Closeout Submittals | Jun 2014 |
| 01 78 23.16 | Maintenance Data | Nov 2013 |
| 01 78 23.19 | Preventative Maintenance Instructions | Nov 2013 |
| 01 78 33 | Bonds | Nov 2013 |
| 01 78 36 | Warranties | Nov 2013 |
| 01 78 39 | Project Record Documents | Jun 2014 |
| 01 79 00 | Demonstration and Training | May 2018 |
| Appendices | ||
| A015110 | Temporary Services | |
| A015120 | Tree Protection Zone | |
| A015210 | Construction Sites |
| Section # | Title | Last Revised |
|---|---|---|
| 04 01 20.52 | Unit Masonry Cleaning | Jun 2014 |
| 04 01 20.91 | Unit Masonry Restoration | Nov 2013 |
| 04 01 40.52 | Stone Cleaning | Jun 2014 |
| 04 01 40.91 | Stone Restoration | Nov 2013 |
| 04 20 00 | Unit Masonry | Nov 2013 |
| 04 21 13 | Duke Brick | Jun 2014 |
| 04 40 00 | Duke Stone Assemblies | Jun 2014 |
| Appendices | ||
| A042010 | Duke Brick | |
| A044010 | Duke Stone | |
| A044090 | Stone Rest |
| Section # | Title | Last Revised |
|---|---|---|
| 07 00 00 | Thermal and Moisture Protection | Nov 2013 |
| 07 13 00 | Sheet Waterproofing | Jun 2014 |
| 07 19 00 | Water Repellants | Nov 2013 |
| 07 21 00 | Thermal Insulation | Nov 2013 |
| 07 26 00 | Vapor Retarders | Nov 2013 |
| 07 30 00 | Steep Slope Roofing | Nov 2013 |
| 07 40 00 | Roofing | Jun 2014 |
| 07 41 63 | Fabricated Roof Panel Assemblies | Nov 2013 |
| 07 60 00 | Flashing and Sheet Metal | Nov 2013 |
| 07 70 00 | Roof and Wall Specialties and Accessories | Nov 2013 |
| 07 80 00 | Fire and Smoke Protection | Nov 2013 |
| 07 90 00 | Joint Protection | Jun 2014 |
| Appendices | ||
| A074090 | Roofing |
| Section # | Title | Last Revised |
|---|---|---|
| 08 00 00 | Openings | Jun 2014 |
| 08 01 80 | Maintenance of Glazing (Leaded Glass Window Restoration) | Nov 2013 |
| 08 11 00 | Metal Doors and Frames | Jun 2014 |
| 08 14 00 | Wood Doors | Nov 2013 |
| 08 51 13 | Aluminum Windows | Nov 2013 |
| 08 70 00 | Hardware | Nov 2013 |
| 08 71 00 | Door Hardware | Jun 2014 |
| 08 90 00 | Louvers and Vents | Jun 2014 |
Division 09 - reserved
| Section # | Title | Last Revised |
|---|---|---|
| 10 00 00 | Specialties | Mar 2018 |
| 10 11 00 | Visual Display Surfaces | June 2014 |
| 10 14 00 | Signage | June 2014 |
| 10 21 13.19 | Plastic Toilet Compartments | Nov 2013 |
| 10 28 13.13 | Commercial Toilet Accessories | Mar 2018 |
| 10 44 13 | Fire Extinguisher Cabinets | June 2014 |
| 10 44 16 | Fire Extinguishers | June 2014 |
| 10 51 13 | Metal Lockers | June 2014 |
| Appendices | ||
| A101420 | Signage | |
| A102813 | Bath Accessories | Nov 2025 |
| A105613 | Metal Shelving |
| Section # | Title | Last Revised |
|---|---|---|
| 11 00 00 | Equipment | Jun 2014 |
| 11 12 00 | Parking Control Equipment | Nov 2013 |
| 11 13 00 | Loading Dock Equipment | Nov 2013 |
| 11 21 23 | Vending Equipment | Nov 2013 |
| 11 30 00 | Residential Equipment | Nov 2013 |
| 11 40 00 | Foodservice Equipment | Nov 2013 |
| 11 52 00 | Audio-Visual Equipment | Nov 2013 |
| 11 53 00 | Laboratory Equipment | Jun 2014 |
| 11 82 13 | Solid Waste Bins | Feb 2017 |
| 11 82 26 | Waste Compactor and Destructors | Feb 2017 |
| Appendices | ||
| A111310 | Equipment items | |
| A118213 | Solid Waste Bins | |
| A118223 | Recycling Equipment | |
| A118226 | Waste Compactor and Destructors |
Division 12 - reserved
Division 15 - reserved
Division 16 - reserved
Division 17 - reserved
Division 18 - reserved
Division 19 - reserved
Division 20 - reserved
| Section # | Title | Last Revised |
|---|---|---|
| 22 05 00 | Common Work Results for Plumbing | Mar 2018 |
| 22 05 09 | Meters and Gauges for Plumbing | Jan 2019 |
| 22 05 23 | Valves for Plumbing Piping | Oct 2026 |
| 22 07 00 | Insulation and Identification For Plumbing Piping and Equipment | Aug 2026 |
| 22 08 00 | Commissioning of Plumbing | Mar 2018 |
| 22 09 23 | Plumbing Systems Control Schematics | Aug 2026 |
| 22 09 23.13 | Water Utility Metering | Feb 2025 |
| 22 09 93 | Plumbing Systems Sequences of Operations | Aug 2026 |
| 22 10 10 | Plumbing Pumps | Aug 2026 |
| 22 11 18 | Plumbing Piping | Nov 2024 |
| 22 11 19 | Domestic Water Specialties | Mar 2018 |
| 22 30 00 | Domestic Hot Water Systems | Aug 2026 |
| 22 40 00 | Plumbing Fixtures | Mar 2018 |
| 22 60 00 | Gas and Vacuum Systems for Laboratory and Healthcare Facilities | Mar 2018 |
| Section # | Title | Last Revised |
|---|---|---|
| 23 00 00.01 | Load Calculations | Aug 2024 |
| 23 00 00.02 | Requirements for Drawings | Aug 2024 |
| 23 00 00.10 | Mechanical Equipment Room Design | Aug 2024 |
| 23 05 13 | Common Motor Requirements for HVAC Equipment | Nov 2024 |
| 23 05 23 | Valves for Mechanical Piping | Oct 2026 |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | Nov 2024 |
| 23 07 00 | Insulation and Identification For Mechanical Piping and Equipment | Aug 2026 |
| 23 08 00 | Commissioning of HVAC Systems | Mar 2018 |
| 23 09 13 | HVAC Instrumentation and Control | Sept 2026 |
| 23 09 23 | Sensors and Instruments | Feb 2025 |
| 23 09 23.10 | BACnet Control Systems and Integration | Sept 2026 |
| 23 09 23.11 | Pressure Independent Control Valves | Feb 2025 |
| 23 09 23.13 | Thermal Utility Metering | Mar 2026 |
| 23 09 93 | HVAC Sequences of Operations | Sept 2026 |
| 23 09 93.10 | HVAC Control Schematics | Sept 2026 |
| 23 21 13 | Building Mechanical Piping | Nov 2024 |
| 23 21 23 | Hydronic Pumps | April 2025 |
| 23 22 13 | Building Steam & Condensate Piping Systems | Feb 2025 |
| 23 25 00 | HVAC Water Treatment, Flushing and Cleaning | Nov 2024 |
| 23 31 00 | HVAC Ducts and Casings | April 2025 |
| 23 50 00 | Building Central Heating Equipment | Nov 2024 |
| 23 60 00 | Chilled Water and Heating Hot Water Systems | Jul 2026 |
| 23 70 00 | Central HVAC Equipment (Air Handling Units) | April 2025 |
| 23 82 19 | Fan Coil and Blower Coil Units | April 2025 |
| Appendices | ||
| N/A | Duke-Siemens | April 2025 |
Division 24 - reserved
Division 25 - reserved
| Section # | Title | Last Revised |
|---|---|---|
| 26 05 19 | Building Wire and Cable | Mar 2018 |
| 26 05 26 | Grounding and Bonding for Electrical Systems | Mar 2018 |
| 26 05 33 | Raceway and Boxes for Electrical Systems | Mar 2018 |
| 26 05 53 | Identification | Jan 2019 |
| 26 05 76 | Arc-Flash Studies | May 2015 |
| 26 08 00 | Commissioning of Electrical Systems | Mar 2018 |
| 26 08 01 | Electrical Acceptance Testing | Jun 2014 |
| 26 20 00 | Low-Voltage Electrical Distribution | Mar 2018 |
| 26 24 00 | Switchboards and Panelboards | Jun 2014 |
| 26 24 16 | Panelboards | Oct 2014 |
| 26 27 26 | Wiring Devices | Jun 2014 |
| 26 56 00 | Area Site Lighting | Jan 2019 |
Division 29 - reserved
Division 30 - reserved
| Section # | Title | Last Revised |
|---|---|---|
| 32 01 90 | Operation and Maintenance of Planting | Jan 2019 |
| 32 01 90.13 | Fertilizing | Nov 2018 |
| 32 01 90.23 | Pruning | Nov 2018 |
| 32 01 90.26 | Watering | Nov 2018 |
| 32 80 00 | Irrigation | Aug 2017 |
| 32 91 13 | Soil Preparation | Feb 2016 |
| 32 91 13.26 | Mulch | Nov 2018 |
| 32 92 19 | Seeding | Jan 2019 |
| 32 92 23 | Sodding | Nov 2018 |
| 32 93 00 | Plants | Feb 2016 |
| 32 93 13 | Groundcovers | Nov 2018 |
| 32 93 43 | Trees | Mar 2018 |
| Appendices | ||
| A320010 | Boundary Fencing | |
| A329100 | Tree Planting Detail | |
| A015639 | Tree Protection Zone | |
| Tree Protection - Maintenance Road | ||
| Tree Protection - Boring Under Crown Dripline | ||
| Modified Existing Soil- Compacted Subsoil (Trenching) | ||
| Section # | Title | Last Revised |
|---|---|---|
| 33 11 00 | Water Utility Distribution Piping | Mar 2018 |
| 33 30 00 | Sanitary Sewer | Mar 2018 |
| 33 40 00 | Storm Drainage | Mar 2018 |
| 33 61 00 | Chilled Water Distribution | Jul 2026 |
| 33 62 00 | Heating Hot Water Distribution | June 2026 |
| 33 63 00 | Underground Steam and Condensate System | Mar 2018 |
| 33 70 00 | 44kV Loop Easement Work Approval Process | Mar 2025 |
| Appendices | ||
| A336300 | Steam Energy Distribution |
Division 34 - Transportation
Division 35 - Waterway and Marine Construction
Division 36 - reserved
Division 37 - reserved
Division 38 - reserved
Division 39 - reserved
Division 40 - reserved
Division 41 - Material Processing and Handling Equipment
Division 42 - Process Heating, Cooling, and Drying Equipment
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment
Division 44 - Pollution Control Equipment
Division 45 - Industry-Specific Manufacturing Equipment
Division 46 - reserved
Division 47 - reserved
Division 48 - Electrical Power Generation
Division 49 - reserved
Division 50 - reserved
| Title |
|---|
| Support Space - Planning Standards: |
| - Telecommunication Systems Guidelines |
| - Service Spaces |
| - Lactation Rooms |
| Sustainable Building Guidelines & Related Documents: |
| - Sustainable Building Guideline |
| - Sustainable Building Project Checklist |
| - Energy Modeling Information Form |
| Utility Marking Standards |
| Conceptual Design Goals |